Companion
Cisco RA coverage map
Customer version, 2026-11-03. Companion to the Open Ethernet deployment pattern. Section numbers follow the rebuilt RA (rail block naming, NVL72 sections, the NVIDIA language section 1).
Sources for the Cisco outline:
- [C1] Cisco N9000 Enterprise RA, HGX B300 (read 2026-08-26). The Hyperfabric HGX B300 RA has the identical section structure with HF6100 switches; it is covered by the same rows.
- [C2] Cisco N9000 Cloud RA with HGX H200, NCP compliant (read 2026-08-26). Rows 31 to 41 are the sections and requirements it adds beyond C1.
- [C4] Cisco EBox NCP HGX High Performance Storage RA, 2026, for the storage rows.
Status values: Matched (an Edgecore section answers the same point), Partial (answered in part, or answered with an open item), N/A (outside what a switch vendor supplies, or deliberately excluded by the positioning), Gap (Cisco has it, we do not).
Part 1
1Step 1 and Step 2: Cisco outline mapped to Edgecore coverage
| # | Cisco section | Requirement or point it addresses | Edgecore RA section | Open Ethernet with Edgecore | Alongside NVIDIA NCP | Status | Tag | Source for our answer |
|---|---|---|---|---|---|---|---|---|
| 1 | Introduction [C1] | On prem AI cluster blueprint, adheres to NVIDIA HGX B300 ERA, up to 1,024 GPUs; one switch family for frontend, storage, backend, OOB; controller managed | 2, cover | Open blueprint, 256 to 2,048 GPUs, one switch model; no NVIDIA ERA adherence claimed | Frontend, storage, OOB only | Matched | VERIFIED / INFERRED | E4; S6; L Q1 |
| 2 | Hardware: HGX B300 Rack Server [C1] | C-G-N-B naming; 8x B300 on NVLink; 8x CX-8 east west; 1 or 2 BF3 B3240 north south; NVIDIA-Certified servers | 5.1 | Any HGX B300; same NIC roles | Same | Matched | VERIFIED | S6 Table 5; C1 |
| 3 | Cisco N9364E-SG2-O [C1] | 2RU, 64 x 800G OSFP (128 x 400G), leaf and spine | 5.1, 16 | AIS800-64O, 2RU, 64 x OSFP800, 2 x 400G breakout, TH5 | Frontend and storage | Matched | VERIFIED | E1 |
| 4 | Cisco N9164E-NS4-O [C1] | Spectrum-4 alternative for east west | 2, 9 | Not applicable (open fabric) | East west is NVIDIA's | N/A | VERIFIED | S2; IPR |
| 5 | Cisco Nexus 9332D-GX2B [C1] | 32 x 400G storage leaf | 11.1, 11.2, 16 | AIS800-64O storage leaf pair; AIS800-32O optional | Same | Matched | VERIFIED | E1; E2; E4 |
| 6 | Cisco Nexus 93108TC-FX3 [C1] | 48 x 1/10GBASE-T management switch with 100G uplinks | 11.3 | EPS201 48 x 1G, 25G and 100G uplinks; no 10GBASE-T host management switch | Same | Partial | VERIFIED / gap G7 | E3 |
| 7 | Cisco UCS C225 M8 [C1] | Support, control and storage servers | cover | Ports reserved via frontend; servers customer supplied | Same | N/A | n/a | n/a |
| 8 | Cisco Optics and cables, Table 1 [C1] | Optic per device incl. riding heat sink OSFPR for CX-8 | 5.6, 16 | ET8001-2DR4, ET7512-DR4 part numbers; specs and CX-8 fit UNKNOWN | Frontend only | Partial | UNKNOWN | E4; gap G4 |
| 9 | Networking topologies: Overview [C1] | Three separate fabrics: compute, converged, OOB | 1.1 | Four networks (adds storage leaves) | Three of four | Matched | VERIFIED | S1; N1 Ch.4 |
| 10 | Compute (east west) network, Tables 2 and 3 [C1] | CX-8 2 x 400G; single and dual plane, dual recommended; switch, transceiver, cable counts | 5.2, 5.3, 5.4, 5.5 | Single plane 800G per GPU baseline; dual plane option with counts | NVIDIA owned | Matched | VERIFIED / INFERRED | E4; C1 |
| 11 | Converged (north south) network, Table 4 [C1] | 2 x 400G per node to two switches; 12.5 Gbps per GPU storage reserve; ports for support servers | 11.1 | Dual homed 2 x 400G; 12.5 to 50 Gbps per GPU storage uplink | Same | Matched | INFERRED | E4 |
| 12 | Out of band management network [C1] | 1G BMC, 1G DPU BMC, 10G host ports; switch mgmt ports; 100G uplink to converged spine | 11.3 | 6 x 1G per server per S6, plus switch mgmt; 10G host ports not counted | Same | Partial | VERIFIED / gap G7 | E4; E3 |
| 13 | Topology with 16 nodes [C1] | 128 GPU drawing and counts | 5.4 | Backend counts only, no drawing | Frontend not sized | Partial | INFERRED | arithmetic |
| 14 | Topology with 32 nodes [C1] | 256 GPU drawing and counts | 5.3, 5.2 | Full counts and drawing | Frontend counts | Matched | VERIFIED design | E4 slide 4 |
| 15 | Topology with 64 nodes [C1] | 512 GPU drawing and counts | 5.3, 11.1 | Full counts and drawing | Frontend counts | Matched | VERIFIED design | E4 slide 5 |
| 16 | Topology with 128 nodes [C1] | 1,024 GPU drawing and counts | 5.4 | Backend counts only; frontend not sized | Not sized | Partial | INFERRED | arithmetic |
| 17 | Cluster BOM, single plane, Table 5 [C1] | PIDs and quantities per cluster size | 16 | Model, role, quantity, no prices | Reduced BOM | Matched | VERIFIED design | E4 slides 7 to 9 |
| 18 | Cluster BOM, dual plane, Table 6 [C1] | Same for dual plane | 5.5 | Switch counts only, no separate BOM | n/a | Partial | INFERRED | arithmetic |
| 19 | High-Performance Storage [C1] | VAST EBox, NVIDIA-Certified storage; other certified partners allowed | 11.2 | Generic partner integration, RoCEv2 QoS spec, N1 targets; certification not documented for Edgecore | Same | Partial | VERIFIED / UNKNOWN | C4; N1 Table 5.2 |
| 20 | Software: Network controller [C1] | Nexus Dashboard plus Ansible, Chef, Puppet | 13 | Open tooling, ZTP, config as code; no Edgecore controller documented | Same | Partial | INFERRED | n/a |
| 21 | Software: Compute controller [C1] | Intersight or BCM | cover | Out of scope | Same | N/A | n/a | n/a |
| 22 | Software: Storage controller [C1] | VAST management | cover, 11.2 | Storage vendor's | Same | N/A | n/a | n/a |
| 23 | NVIDIA AI Enterprise, NIM [C1] | Host software suite | 12 | Unaffected by switch choice | Same | N/A | n/a | C1 |
| 24 | NVIDIA Spectrum-X [C1] | Spectrum-X benefits via FGLB license on Silicon One; native on NS4 | 9 | Honest comparison; Spectrum-X not available; TH5 DLB, GLB | NVIDIA owned on CIN | Partial | VERIFIED / UNKNOWN | E1; N1 4.1; E9 |
| 25 | Security [C1] | Cisco security portfolio, beyond RA scope | 14 | Platform RoT and TPM; VRF separation; no security product | Same | Partial | VERIFIED | E1 |
| 26 | Observability [C1] | Splunk, beyond RA scope | 13 | Silicon in band telemetry; collector is customer choice | Same | Partial | VERIFIED / INFERRED | E1 |
| 27 | Testing and certification [C1] | NVIDIA-Certified systems and storage; HPC, IB PerfTest, NCCL, MLPerf run | 15 | Plan only; the public collective benchmark on AMD GPUs with Broadcom NICs; no certification | Same | Gap | VERIFIED partial | E9 |
| 28 | Summary [C1] | Scalable, easy to manage, high performance | cover | Executive summary | Same | Matched | n/a | n/a |
| 29 | Appendix A: Compute server spec [C1] | CPUs, memory, 8x CX-8, BF3 B3240, host mgmt NIC | 5.1 | Node network interface table; rest is the server vendor's | Same | Partial | VERIFIED | S6; C1 |
| 30 | Appendix B: Control node spec [C1] | Support server minimum spec | cover | Out of scope | Same | N/A | n/a | n/a |
| 31 | Two tier east west with 32 node SU and rail groups [C2] | SU = 32 HGX nodes, rail groups, one hop inside SU, tenant efficiency | 5.2, 14 | Same 32 node size, the Edgecore rail block; one leaf per rail | NVIDIA owned | Matched | VERIFIED | E4; C2 |
| 32 | Three tier east west, SU groups, super spine [C2] | SU group of 4 SUs; super spine groups; scale to 32K GPUs | 7 | Pod of 4 rail blocks; 32 super spine planes; to 65,536 GPUs; dual plane alternative | NVIDIA owned | Matched | INFERRED | E1 arithmetic |
| 33 | NCP compliance on east west [C2] | N9164E-NS4-O for compliance; Silicon One "without NCP compliance" | 2, 17 row 5 | Explicitly non NCP | Edgecore excluded from the CIN (IPR NET-2) | N/A | VERIFIED | S2; IPR NET-2; L Q20 |
| 34 | Converged north south storage and management [C2] | Storage access, host management from management nodes, border, data lakes | 11.1, 11.2 | Covered | Covered | Matched | INFERRED | E4 |
| 35 | Switch management network [C2] | Separate 1G network for switch mgmt ports | 11.3 | Counted in OOB | Same | Matched | VERIFIED design | E4 |
| 36 | BlueField-3 management network [C2] | DPU BMC ports on 1G | 11.3 | Inside NVIDIA's 6 x 1G per server count [S6] | Same | Partial | INFERRED | C1 port list |
| 37 | Miscellaneous service network [C2] | PDUs, terminal servers on 1G | 11.3 | Drawn, not counted | Same | Partial | INFERRED | n/a |
| 38 | Multitenancy [C2] | VXLAN with BGP EVPN; vrfOOBMgmt, vrfStorageInternal, per tenant Frontend and Backend VRFs | 11.1, 14 | Same VRF model; backend EVPN on RoCE UNKNOWN | Frontend only | Partial | INFERRED / UNKNOWN | C2; S3; gap G6 |
| 39 | Workload orchestration [C2] | Tenant management nodes for provisioning, Slurm, Kubernetes | 11.1 | Reachable via tenant frontend VRF; nodes customer supplied | Same | N/A | n/a | n/a |
| 40 | Edge and border connectivity [C2] | Border leaves, L3 routing, VXLAN inside the fabric | 11.1, 17 rows 23 and 24 | AIS800 as border; ZR, ZR+ DCI per datasheet | Same | Matched | VERIFIED / INFERRED | E1 |
| 41 | High availability tests (switch and link failure) [C2 Testing] | HA tested | 15 test 8 | Planned, no result published | Same | Gap | UNKNOWN | section 15 test 8 |
Part 2
2Coverage statistics
| Status | Count | Rows |
|---|---|---|
| Matched | 16 | 1, 2, 3, 5, 9, 10, 11, 14, 15, 17, 28, 31, 32, 34, 35, 40 |
| Partial | 16 | 6, 8, 12, 13, 16, 18, 19, 20, 24, 25, 26, 29, 36, 37, 38, 41 |
| N/A | 8 | 4, 7, 21, 22, 23, 30, 33, 39 |
| Gap | 1 | 27 (testing and certification) |
| Total | 41 |
Of the 33 rows that apply to a switch vendor (41 minus 8 N/A), 16 are matched (48 percent), 16 partial (48 percent) and 1 is a gap (3 percent).
Part 3
3NVIDIA and NCP requirement rows (not Cisco sections)
These are checked in the compliance matrix, section 17 of the RA:
- NVIDIA DGX SuperPOD B300 Ethernet [N1]: SU concept (64 nodes), rail aligned compute, twin plane, storage 1:1 and about 4:3, VXLAN EVPN segmentation, OOB on its own VXLAN, customer edge 2 x 100GbE DR1 with BGP, storage performance guidelines.
- NCP [S1, S2, IPR, R24]: TAN and SMN always Ethernet; CIN InfiniBand or Spectrum-X; IPR NET-1 BlueField-3 north south; IPR NET-2 east west InfiniBand or Spectrum-X; IPR NET-5 BGP EVPN; IPR NET-6 EVPN VXLAN; IPR STO-2 RDMA storage; R24 NET01, CNP08, CNP10, SDN04, SDN09, SEC12, SEC13, SEC16, SEC18. The R24 exception clause governs R24's own baseline only.